Operational Guideline dated 17.12.2019 for the Scheme of Integrated Cold Chain and Value Addition Infrastructure-reg
Operational Guideline dated 18.01.2019 for the Scheme of Integrated Cold Chain and Value Addition Infrastructure-reg
Operational Guidelines applicable to Expression of Interest floated before dated 20.11.2013
Revised operational guidelines effective for Expression of Interest floated after dated 20.11.2013
Revised Operational Guidelines for the Scheme for Integrated Cold Chain and Value Addition Infrastructure dated 08.03.2018
Revised Operational Guidelines Of The Scheme For Cold Chain, Value Addition And Preservation Infrastructure During The Balance
Revised Operational guidelines of the Scheme for integrated cold chain and value addition Infrastructure
Withdrawal of Operational Guidelines for Integrated Cold Chain and Value Addition Infrastructure dated 01.03.2018